The iconic Royal Albert Hall
What an honour it is to be partnering long term on such a celebrated building and with a fantastic in-house team.
Our exclusive video case study reveals all about our work to date on this 152-year-old venue, from making watertight the spectacular 800 tonne glass domed roof and overseeing repairs to the expansive auditorium ceiling, to redesigning the loading bay dock and crucial fire safety works. Enjoy stories from the team about how we had to rehome hundreds of bees, and how drones, abseilers and steely determination all played a major role.